| 404315447 | Form 17 | 8/12/2025 | 8/13/2025 | PLUNGER LIFT | 344 | CONTINUOUS | GAS | 0 | WHISPER | 146 | 147 | No | -- | -- | TEP has initiated a diagnostic evaluation due to the bradenhead threshold pressure exceedance. The bradenhead test was performed through two-inch valve. |
| 404067499 | Form 17 | 1/22/2025 | 1/23/2025 | PLUNGER LIFT | 343 | CONTINUOUS | GAS | 0 | NO FLOW | 142 | 144 | No | -- | -- | TEP has initiated a diagnostic evaluation due to the threshold pressure exceedance. |
| Click for Specifics | Full | 4/3/2024 | 5/13/2024 | | 332 | N/A | -- | 0 | No Flow | 149 | 151 | No | No | No | 2" Blowdown |
| Click for Specifics | Full | 3/17/2023 | 4/10/2023 | Plunger Lift | 319 | N/A | -- | 0 | Whisper | 160 | 148 | No | No | No | 1/2" blowdown |
| Click for Specifics | Full | 10/25/2022 | 11/8/2022 | Plunger Lift | 326 | N/A | -- | 0 | No Flow | 156 | 159 | No | No | No | |
| Click for Specifics | Full | 6/18/2021 | 7/12/2021 | Plunger Lift | 316 | N/A | -- | 0 | Continuous | 166 | 166 | No | No | No | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 269 | | -- | -- | No | No | No | |