| 404226625 | Form 17 | 5/28/2025 | 6/3/2025 | PLUNGER LIFT | 92 | CONTINUOUS | GAS | 0 | NO FLOW | 162 | 167 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| 403791444 | Form 17 | 5/14/2024 | 5/15/2024 | CLOCK/INTERMITTER | 59 | CONTINUOUS | GAS | 0 | NO FLOW | 56 | 45 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| 403523464 | Form 17 | 9/7/2023 | 9/7/2023 | CLOCK/INTERMITTER | 155 | CONTINUOUS | GAS | 0 | NO FLOW | 41 | 49 | No | -- | -- | The bradenhead test was performed through a 2" valve. |
| Click for Specifics | Full | 6/15/2023 | 7/17/2023 | Clock/Intermitter | 116 | N/A | -- | 0 | No Flow | 105 | 107 | No | No | No | 2" vlave |
| Click for Specifics | Full | 3/18/2022 | 4/18/2022 | Clock/Intermitter | 89 | N/A | -- | 0 | No Flow | 144 | 146 | No | No | No | 2 inch ball valve |
| Click for Specifics | Full | 6/29/2021 | 7/12/2021 | Shut-In | 85 | N/A | -- | 0 | No Flow | 183 | 186 | No | No | No | |
| Click for Specifics | Light | 6/12/2019 | 6/2/2020 | | 56 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 6/13/2017 | 6/2/2020 | | 61 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 6/22/2016 | 6/2/2020 | | 72 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 1/24/2004 | 6/2/2020 | | 110 | | | 0 | | -- | -- | No | No | No | |