| 404647263 | Form 17 | 5/4/2026 | 5/5/2026 | PLUNGER LIFT | 230 | CONTINUOUS | GAS | 0 | NO FLOW | 142 | 143 | No | -- | -- | TEP has initiated a diagnostic evaluation of this well due to the bradenhead threshold pressure exceedance. The test was performed through a 1/2" valve. |
| Click for Specifics | Full | 3/16/2026 | 4/6/2026 | | 208 | N/A | -- | 0 | No Flow | 147 | 142 | No | No | No | 1/2 blowdown Cycled during test |
| Click for Specifics | Full | 2/27/2025 | 3/11/2025 | | 108 | N/A | -- | 0 | No Flow | 142 | 141 | No | No | No | 1/2'' blowdown. Cycled durig test. |
| Click for Specifics | Full | 6/4/2024 | 7/9/2024 | | 16 | N/A | -- | 0 | No Flow | 146 | 148 | No | No | No | 1/2 valve |
| Click for Specifics | Full | 1/26/2023 | 2/7/2023 | Clock/Intermitter | 1 | N/A | -- | 0 | No Flow | 141 | 145 | No | No | No | 1/2 Blowdown |
| Click for Specifics | Full | 2/7/2022 | 3/7/2022 | Plunger Lift | 0 | N/A | -- | 0 | No Flow | 170 | 170 | No | No | No | blow down 1/2 inch |
| Click for Specifics | Full | 8/17/2021 | 9/6/2021 | Plunger Lift | 60 | N/A | -- | 0 | Down to Zero | 190 | 190 | No | No | No | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 8/30/2015 | 6/2/2020 | | 252 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 8/17/2013 | 6/2/2020 | | 291 | | | 0 | | -- | -- | No | No | No | |