| 404289358 | Form 17 | 5/28/2025 | 7/22/2025 | CLOCK/INTERMITTER | 131 | CONTINUOUS | GAS | 0 | NO FLOW | 72 | 76 | No | -- | -- | This test is being resubmitted to correct the date on the previous test. The previous approved document is attached for reference.
This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| 403785643 | Form 17 | 5/9/2024 | 5/9/2024 | CLOCK/INTERMITTER | 156 | CONTINUOUS | GAS | 0 | NO FLOW | 37 | 44 | No | -- | -- | This is an annual bradenhead test that was performed on Day Two of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| Click for Specifics | Full | 6/15/2023 | 7/17/2023 | Clock/Intermitter | 113 | N/A | -- | 0 | No Flow | 66 | 59 | No | No | No | 2" valve |
| 403101103 | Form 17 | 7/8/2022 | 7/11/2022 | CLOCK/INTERMITTER | 153 | CONTINUOUS | GAS | 0 | NO FLOW | 75 | 76 | No | -- | -- | |
| Click for Specifics | Full | 7/1/2022 | 8/9/2022 | Clock/Intermitter | 121 | N/A | -- | 0 | No Flow | 82 | 87 | No | No | No | 2" Blowdown |
| Click for Specifics | Full | 6/29/2021 | 7/12/2021 | Shut-In | 86 | N/A | -- | 0 | No Flow | 123 | 123 | No | No | No | |
| Click for Specifics | Light | 6/12/2019 | 6/2/2020 | | 101 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 6/13/2017 | 6/2/2020 | | 105 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 6/22/2016 | 6/2/2020 | | 109 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 8/18/2005 | 6/2/2020 | | -- | | | -- | | -- | -- | No | No | No | |
| Click for Specifics | Light | 8/3/2003 | 6/2/2020 | | 35 | | | 0 | | -- | -- | No | No | No | |