| 404206689 | Form 17 | 5/8/2025 | 5/15/2025 | PLUNGER LIFT | 328 | CONTINUOUS | GAS | 0 | WHISPER | 72 | 68 | No | -- | -- | This is an annual bradenhead test that was performed on day two of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 1/2 inch valve. Well cycled during test. |
| 403705223 | Form 17 | 3/1/2024 | 3/1/2024 | PLUNGER LIFT | 75 | CONTINUOUS | GAS | 0 | WHISPER | 74 | 69 | No | -- | -- | This is an annual bradenhead test using the ECMC approved pilot testing procedure for 2024 which does not involve a seven-day shut-in of the connected bradenhead prior to performing the test. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 1/2" valve. |
| 403324333 | Form 17 | 2/16/2023 | 2/17/2023 | PLUNGER LIFT | 340 | CONTINUOUS | GAS | 0 | NO FLOW | 73 | 79 | No | -- | -- | This is an annual bradenhead test that was performed on day three of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 1/2" valve. |
| Click for Specifics | Full | 3/21/2022 | 4/18/2022 | Plunger Lift | 80 | N/A | -- | 80 | N/A | 63 | 77 | No | No | No | Tied in |
| Click for Specifics | Full | 7/2/2021 | 8/9/2021 | Plunger Lift | 468 | N/A | -- | 0 | Surge | 93 | 98 | No | No | No | |
| 402739291 | Form 17 | 7/2/2021 | 7/7/2021 | PLUNGER LIFT | 468 | CONTINUOUS | GAS | 0 | SURGE | 93 | 98 | No | -- | -- | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 0 | | -- | -- | No | No | No | |