| 404105498 | Form 17 | 2/25/2025 | 2/25/2025 | CLOCK/INTERMITTER | 110 | CONTINUOUS | GAS | 0 | WHISPER | 41 | 44 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| 403888101 | Form 17 | 8/13/2024 | 8/13/2024 | CLOCK/INTERMITTER | 112 | CONTINUOUS | GAS | 0 | NO FLOW | 46 | 47 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| Click for Specifics | Full | 7/5/2023 | 8/14/2023 | Clock/Intermitter | 42 | N/A | -- | 40 | N/A | 42 | 40 | No | No | No | Tied in |
| Click for Specifics | Full | 3/11/2022 | 4/18/2022 | Plunger Lift | 81 | N/A | -- | 81 | N/A | 90 | 90 | No | No | No | Tied in |
| Click for Specifics | Full | 6/29/2021 | 7/12/2021 | Shut-In | 66 | N/A | -- | 66 | N/A | 90 | 106 | No | No | No | Tied into flow line |
| 402366250 | Form 17 | 4/8/2020 | 4/9/2020 | PLUNGER LIFT | 151 | GAS | -- | 0 | VAPOR | 81 | 94 | No | -- | -- | Brandenhead left open and added to flow test list per Craig Burger. |
| Click for Specifics | Light | 6/12/2019 | 6/2/2020 | | 12 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 5/9/2017 | 6/2/2020 | | 10 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 6/22/2016 | 6/2/2020 | | 11 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 1/28/2006 | 6/2/2020 | | -- | | | -- | | -- | -- | No | No | No | |
| Click for Specifics | Light | 5/27/2001 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |