| 404096840 | Form 17 | 2/18/2025 | 2/18/2025 | CLOCK/INTERMITTER | 134 | CONTINUOUS | GAS | 0 | WHISPER | 108 | 99 | No | -- | -- | This is an annual bradenhead test that was performed on day one of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed 1/2 inch valve. Well cycled during test |
| 403690773 | Form 17 | 2/15/2024 | 2/16/2024 | CLOCK/INTERMITTER | 101 | CONTINUOUS | GAS | 0 | NO FLOW | 101 | 107 | No | -- | -- | This is an annual bradenhead test using the ECMC approved pilot testing procedure for 2024 which does not involve a seven-day shut-in of the connected bradenhead prior to performing the test. The bradenhead is connected to the flowline with an approved pressure management plan. The test was performed through a 1/2" valve. |
| 403306786 | Form 17 | 1/26/2023 | 1/31/2023 | CLOCK/INTERMITTER | 141 | CONTINUOUS | GAS | 0 | NO FLOW | 111 | 99 | No | -- | -- | This is an annual bradenhead test that was performed on day three of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the flowline with an approved pressure management plan. The test was performed through a 1/2" valve. |
| 403042065 | Form 17 | 5/6/2022 | 5/9/2022 | CLOCK/INTERMITTER | 147 | CONTINUOUS | GAS | 0 | NO FLOW | 114 | 115 | No | -- | -- | Test performed through 1/2" valve. |
| Click for Specifics | Full | 2/2/2022 | 3/7/2022 | Clock/Intermitter | 139 | N/A | -- | 0 | No Flow | 109 | 115 | No | No | No | 1/2 ball valve |
| 402757085 | Form 17 | 7/21/2021 | 7/22/2021 | CLOCK/INTERMITTER | 115 | CONTINUOUS | GAS | 0 | NO FLOW | 126 | 130 | No | -- | -- | |
| Click for Specifics | Full | 6/2/2021 | 7/12/2021 | Clock/Intermitter | 170 | N/A | -- | 1 | Whisper | 120 | 120 | No | No | No | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 0 | | -- | -- | No | No | No | |