| 404152427 | Form 17 | 4/1/2025 | 4/3/2025 | CLOCK/INTERMITTER | 171 | CONTINUOUS | GAS | 0 | NO FLOW | 98 | 105 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 1/2 inch valve. |
| 403672940 | Form 17 | 1/31/2024 | 1/31/2024 | CLOCK/INTERMITTER | 110 | CONTINUOUS | GAS | 0 | NO FLOW | 113 | 105 | No | -- | -- | This is an annual bradenhead test using the ECMC approved pilot testing procedure for 2024 which does not involve a seven-day shut-in of the connected bradenhead prior to performing the test. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 1/2" valve. |
| 403307763 | Form 17 | 1/31/2023 | 1/31/2023 | CLOCK/INTERMITTER | 136 | CONTINUOUS | GAS | 0 | NO FLOW | 99 | 111 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 1/2" valve. |
| Click for Specifics | Full | 2/23/2022 | 3/7/2022 | Flowing | 115 | N/A | -- | 0 | No Flow | 110 | 100 | No | No | No | 1/2 valve |
| 402819380 | Form 17 | 9/21/2021 | 9/22/2021 | CLOCK/INTERMITTER | 239 | CONTINUOUS | GAS | 0 | NO FLOW | 105 | 105 | No | -- | -- | |
| Click for Specifics | Full | 6/2/2021 | 7/12/2021 | Clock/Intermitter | 250 | N/A | -- | 1 | Whisper | 120 | 120 | No | No | No | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 0 | | -- | -- | No | No | No | |