| 404228989 | Form 17 | 5/27/2025 | 6/4/2025 | CLOCK/INTERMITTER | 173 | CONTINUOUS | GAS | 0 | NO FLOW | 48 | 54 | No | -- | -- | This is an annual bradenhead test that was performed on day six of the seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| 403790285 | Form 17 | 5/13/2024 | 5/14/2024 | CLOCK/INTERMITTER | 169 | CONTINUOUS | GAS | 0 | NO FLOW | 64 | 40 | No | -- | -- | This is an annual bradenhead test that was performed on Day Six of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| Click for Specifics | Full | 6/15/2023 | 7/17/2023 | Clock/Intermitter | 49 | N/A | -- | 0 | No Flow | 138 | 84 | No | No | No | 2" valve |
| Click for Specifics | Full | 7/1/2022 | 8/9/2022 | Clock/Intermitter | 64 | N/A | -- | 0 | No Flow | 93 | 98 | No | No | No | 2" Blowdown |
| Click for Specifics | Full | 6/29/2021 | 7/12/2021 | Flowing | 111 | N/A | -- | 70 | No Flow | 168 | 176 | No | No | No | Tied in flowline. |
| 402408184 | Form 17 | 5/28/2020 | 5/28/2020 | SHUT-IN | 150 | GAS | -- | 0 | NO FLOW | 131 | 131 | No | -- | -- | Bradenhead left open and added to flow test list per Craig Burger. |
| Click for Specifics | Light | 6/12/2019 | 6/2/2020 | | 10 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 6/13/2017 | 6/2/2020 | | 19 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 6/22/2016 | 6/2/2020 | | 29 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 9/30/2005 | 6/2/2020 | | -- | | | -- | | -- | -- | No | No | No | |
| Click for Specifics | Light | 9/7/1997 | 6/2/2020 | | -- | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 9/7/1997 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |