| 404192096 | Form 17 | 5/6/2025 | 5/6/2025 | PLUNGER LIFT | 256 | CONTINUOUS | GAS | 0 | WHISPER | 158 | 156 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. Well cycled during test. |
| 403814939 | Form 17 | 6/4/2024 | 6/5/2024 | | 275 | CONTINUOUS | GAS | 0 | WHISPER | 146 | 144 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 2 inch valve. |
| Click for Specifics | Full | 2/14/2023 | 3/15/2023 | Plunger Lift | 172 | N/A | -- | 0 | Down to Zero | 160 | 154 | No | No | No | Tied into sales line. |
| Click for Specifics | Full | 3/16/2022 | 4/18/2022 | Plunger Lift | 171 | N/A | -- | 171 | N/A | 166 | 166 | No | No | No | blow down 1/2 inch (tied in) |
| Click for Specifics | Full | 7/6/2021 | 8/9/2021 | Shut-In | 361 | N/A | -- | 74 | Continuous | 177 | 179 | No | No | No | |
| 402740110 | Form 17 | 7/6/2021 | 7/7/2021 | PLUNGER LIFT | 361 | CONTINUOUS | GAS | 74 | CONTINUOUS | 177 | 179 | No | -- | -- | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 425 | | -- | -- | No | No | No | |