| 404150614 | Form 17 | 3/31/2025 | 4/2/2025 | CLOCK/INTERMITTER | 115 | CONTINUOUS | GAS | 0 | NO FLOW | 90 | 92 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| 403790230 | Form 17 | 5/13/2024 | 5/14/2024 | CLOCK/INTERMITTER | 115 | CONTINUOUS | GAS | 0 | WHISPER | 62 | 62 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| Click for Specifics | Full | 6/27/2023 | 7/17/2023 | Clock/Intermitter | 54 | N/A | -- | 54 | N/A | 54 | 54 | No | No | No | Tied in to Flowline |
| Click for Specifics | Full | 3/22/2022 | 4/18/2022 | Clock/Intermitter | 89 | N/A | -- | 89 | N/A | 90 | 90 | No | No | No | tied into tubing |
| Click for Specifics | Full | 7/8/2021 | 8/9/2021 | Shut-In | 12 | N/A | -- | 0 | No Flow | 86 | 88 | No | No | No | Tied into flowline. |
| 402364644 | Form 17 | 4/6/2020 | 4/8/2020 | PLUNGER LIFT | 150 | GAS | -- | 0 | WHISPER | 323 | 323 | No | -- | -- | Bradenhead left open and added to flow test list per Craig Burger. |
| Click for Specifics | Light | 6/12/2019 | 6/2/2020 | | 44 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 6/13/2017 | 6/2/2020 | | 48 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 6/15/2016 | 6/2/2020 | | 55 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 3/30/1997 | 6/2/2020 | | 75 | | | 0 | | -- | -- | No | No | No | |