| 404226594 | Form 17 | 5/29/2025 | 6/3/2025 | SHUT-IN | 103 | CONTINUOUS | GAS | 0 | NO FLOW | 0 | 0 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| 403790267 | Form 17 | 5/13/2024 | 5/14/2024 | SHUT-IN | 111 | CONTINUOUS | GAS | 0 | WHISPER | 1380 | 1380 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve.
|
| Click for Specifics | Full | 6/16/2023 | 7/17/2023 | Clock/Intermitter | 56 | N/A | -- | 56 | N/A | 102 | 102 | No | No | No | tied into sales |
| Click for Specifics | Full | 3/16/2022 | 4/18/2022 | Clock/Intermitter | 134 | N/A | -- | 134 | N/A | 134 | 134 | No | No | No | tied into tubing |
| Click for Specifics | Full | 7/8/2021 | 8/9/2021 | Shut-In | 53 | N/A | -- | 53 | Down to Zero | 191 | 191 | No | No | No | |
| 402074983 | Form 17 | 6/13/2019 | 6/14/2019 | PLUNGER LIFT | 178 | GAS | -- | 0 | VAPOR | 709 | 708 | No | -- | -- | |
| Click for Specifics | Light | 6/12/2019 | 6/2/2020 | | 173 | | | -- | | -- | -- | No | No | No | |
| 401310529 | Form 17 | 6/14/2017 | 6/16/2017 | PLUNGER LIFT | 194 | GAS | -- | 0 | DOWN TO 0 | 911 | 911 | No | -- | -- | |
| Click for Specifics | Light | 6/13/2017 | 6/2/2020 | | 185 | | | -- | | -- | -- | No | No | No | |
| 401064764 | Form 17 | 6/17/2016 | 6/17/2016 | SHUT-IN | 197 | GAS | -- | 0 | DOWN TO 0 | 1357 | 1358 | No | -- | -- | |
| Click for Specifics | Light | 6/15/2016 | 6/2/2020 | | 121 | | | -- | | -- | -- | No | No | No | |
| 400976268 | Form 17 | 1/21/2016 | 1/22/2016 | SHUT-IN | 185 | GAS | -- | 0 | NO FLOW | 1034 | 1034 | No | -- | -- | |
| Click for Specifics | Light | 8/21/2003 | 6/2/2020 | | 5 | | | 0 | | -- | -- | No | No | No | |