| 404172809 | Form 17 | 4/21/2025 | 4/21/2025 | CLOCK/INTERMITTER | 88 | CONTINUOUS | GAS | 0 | NO FLOW | 102 | 102 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| 403797006 | Form 17 | 5/20/2024 | 5/20/2024 | CLOCK/INTERMITTER | 77 | CONTINUOUS | GAS | 0 | NO FLOW | 93 | 92 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve.
|
| Click for Specifics | Full | 6/21/2023 | 7/17/2023 | Clock/Intermitter | 62 | N/A | -- | 62 | N/A | 102 | 102 | No | No | No | tied into sales |
| Click for Specifics | Full | 3/14/2022 | 4/18/2022 | Clock/Intermitter | 68 | N/A | -- | 68 | N/A | 102 | 102 | No | No | No | tied into tubing |
| Click for Specifics | Full | 6/15/2021 | 7/12/2021 | Shut-In | 110 | N/A | -- | 79 | No Flow | 102 | 102 | No | No | No | Tied into flow line |
| 402351428 | Form 17 | 3/24/2020 | 3/25/2020 | SHUT-IN | 152 | GAS | -- | 0 | NO FLOW | 94 | 99 | No | -- | -- | Bradenhead left open and added to flow test list per Craig Burger. |
| Click for Specifics | Light | 6/19/2019 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 5/9/2017 | 6/2/2020 | | 3 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 6/15/2016 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 2/16/1997 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |