| 404136198 | Form 17 | 3/20/2025 | 3/20/2025 | CLOCK/INTERMITTER | 123 | CONTINUOUS | GAS | 0 | WHISPER | 101 | 102 | No | -- | -- | This is an annual bradenhead test that was performed on day three of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| 403915959 | Form 17 | 9/9/2024 | 9/10/2024 | CLOCK/INTERMITTER | 128 | CONTINUOUS | GAS | 0 | WHISPER | 108 | 110 | No | -- | -- | This is an annual bradenhead test that was performed on Day Three of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 1/2 inch valve. |
| 403314209 | Form 17 | 2/6/2023 | 2/7/2023 | CLOCK/INTERMITTER | 130 | CONTINUOUS | GAS | 0 | WHISPER | 104 | 102 | No | -- | -- | This is an annual bradenhead test that was performed on day four of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the flowline with an approved pressure management plan. The test was performed through a 1/2" valve. |
| 403046881 | Form 17 | 5/11/2022 | 5/12/2022 | CLOCK/INTERMITTER | 117 | CONTINUOUS | GAS | 0 | NO FLOW | 122 | 121 | No | -- | -- | Test was performed through a 1/2" valve. |
| Click for Specifics | Full | 2/7/2022 | 3/7/2022 | Plunger Lift | 0 | N/A | -- | 0 | No Flow | 149 | 149 | No | No | No | 1/2" blow down |
| Click for Specifics | Full | 9/30/2021 | 10/11/2021 | Plunger Lift | 0 | N/A | -- | 0 | No Flow | 150 | 150 | No | No | No | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 0 | | -- | -- | No | No | No | |