| 404535032 | Form 17 | 1/29/2026 | 2/5/2026 | PLUNGER LIFT | 12 | CONTINUOUS | GAS | 0 | NO FLOW | 174 | 174 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. This well has an approved pressure management plan. The test was performed through a 2 inch valve. |
| 404264814 | Form 17 | 7/2/2025 | 7/2/2025 | PLUNGER LIFT | 105 | CONTINUOUS | GAS | 0 | WHISPER | 161 | 164 | No | -- | -- | TEP has initiated a diagnostic evaluation due to the threshold pressure exceedance. The test was performed through a 1/2" valve. |
| Click for Specifics | Full | 2/27/2025 | 3/11/2025 | | 37 | N/A | -- | 0 | No Flow | 178 | 179 | No | No | No | 1/2" blowdown |
| 403995309 | Form 17 | 11/13/2024 | 11/14/2024 | PLUNGER LIFT | 101 | CONTINUOUS | GAS | 0 | NO FLOW | 160 | 162 | No | -- | -- | TEP has initiated an diagnostic evaluation due to the threshold pressure exceedance. The test was performed through
a two-inch valve. |
| Click for Specifics | Full | 2/7/2024 | 3/19/2024 | Plunger Lift | 68 | N/A | -- | 0 | No Flow | 169 | 171 | No | No | No | 1/2" blowdown |
| Click for Specifics | Full | 3/13/2023 | 4/10/2023 | Plunger Lift | 77 | N/A | -- | 0 | No Flow | 171 | 170 | No | No | No | 1/2" blowdown |
| Click for Specifics | Full | 3/7/2022 | 4/18/2022 | Plunger Lift | 57 | N/A | -- | 0 | No Flow | 155 | 159 | No | No | No | 1/2 blowdown |
| Click for Specifics | Full | 7/20/2021 | 8/9/2021 | Plunger Lift | 64 | N/A | -- | 0 | No Flow | 159 | 156 | No | No | No | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 105 | | -- | -- | No | No | No | |