| 404192081 | Form 17 | 5/6/2025 | 5/6/2025 | PLUNGER LIFT | 92 | CONTINUOUS | GAS | 0 | WHISPER | 161 | 160 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the combustor with an approved pressure management plan. The test was performed through a 2 inch valve. Well cycled during test. |
| Click for Specifics | Full | 2/26/2024 | 3/19/2024 | Plunger Lift | 0 | N/A | -- | 0 | Whisper | 159 | 158 | No | No | No | 2" bh tied into combuster |
| 403372357 | Form 17 | 4/10/2023 | 4/13/2023 | PLUNGER LIFT | 93 | CONTINUOUS | GAS | 0 | WHISPER | 152 | 154 | No | -- | -- | This is an annual bradenhead test that was performed on day five of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to a combustor with an approved pressure management plan. The test was performed through a 2" valve. |
| Click for Specifics | Full | 3/14/2022 | 4/18/2022 | Plunger Lift | 0 | N/A | -- | 0 | N/A | 156 | 153 | No | No | No | Blow down 1/2” (tied in) |
| Click for Specifics | Full | 9/22/2021 | 10/11/2021 | Plunger Lift | 146 | N/A | -- | 31 | Continuous | 165 | 162 | No | No | No | |
| Click for Specifics | Full | 7/6/2021 | 8/9/2021 | Shut-In | 150 | N/A | -- | 33 | Continuous | 165 | 167 | No | No | No | |
| 402740085 | Form 17 | 7/6/2021 | 7/7/2021 | PLUNGER LIFT | 150 | CONTINUOUS | GAS | 33 | CONTINUOUS | 165 | 167 | No | -- | -- | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 0 | | -- | -- | No | No | No | |