| 404623246 | Form 17 | 4/8/2026 | 4/16/2026 | PLUNGER LIFT | 106 | CONTINUOUS | GAS | 0 | WHISPER | 243 | 243 | No | -- | -- | TEP has initiated a diagnostic evaluation of this well due to the bradenhead threshold pressure exceedance. The test
was performed through a two-inch valve. |
| Click for Specifics | Full | 3/24/2026 | 4/6/2026 | | 97 | N/A | -- | 0 | Whisper | 227 | 229 | No | No | No | 2 inch blowdown |
| Click for Specifics | Full | 4/15/2025 | 5/13/2025 | | 84 | N/A | -- | 0 | Whisper | 171 | 169 | No | No | No | 2" Blowdown Cycled during test |
| Click for Specifics | Full | 3/11/2024 | 6/18/2024 | | 73 | N/A | -- | 0 | Whisper | 91 | 94 | No | No | No | 1/2 valve |
| Click for Specifics | Full | 5/19/2023 | 6/12/2023 | Plunger Lift | 74 | N/A | -- | 0 | No Flow | 83 | 85 | No | No | No | 2in Blowdown |
| Click for Specifics | Full | 3/23/2022 | 4/18/2022 | Clock/Intermitter | 77 | N/A | -- | 0 | Whisper | 76 | 77 | No | No | No | 1/2” blowdown |
| Click for Specifics | Full | 7/27/2021 | 8/9/2021 | Plunger Lift | 75 | N/A | -- | 22 | Continuous | 84 | 79 | No | No | No | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 66 | | -- | -- | No | No | No | |