| 404623205 | Form 17 | 4/14/2026 | 4/16/2026 | CLOCK/INTERMITTER | 93 | CONTINUOUS | GAS | 0 | WHISPER | 191 | 191 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. This well has an approved pressure management plan. The test was performed through a 2 inch valve. |
| Click for Specifics | Full | 4/28/2025 | 5/13/2025 | | 128 | N/A | -- | 0 | Whisper | 242 | 242 | No | No | No | 2" blowdown |
| Click for Specifics | Full | 2/28/2024 | 3/19/2024 | Plunger Lift | 127 | N/A | -- | 0 | Whisper | 171 | 172 | No | No | No | 2" Blowdown |
| Click for Specifics | Full | 2/13/2023 | 3/15/2023 | Plunger Lift | 127 | N/A | -- | 0 | Whisper | 147 | 147 | No | No | No | 2in Blowdown |
| Click for Specifics | Full | 10/21/2022 | 11/8/2022 | Plunger Lift | 128 | N/A | -- | 0 | Whisper | 153 | 152 | No | No | No | 2” blowdown |
| 402739316 | Form 17 | 7/1/2021 | 7/7/2021 | PLUNGER LIFT | 132 | CONTINUOUS | GAS | 23 | CONTINUOUS | 164 | 164 | No | -- | -- | |
| Click for Specifics | Full | 7/1/2021 | 8/9/2021 | Plunger Lift | 132 | N/A | -- | 23 | Continuous | 164 | 164 | No | No | No | Venting through 1/2 inch valve |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 130 | | -- | -- | No | No | No | |