| 404550394 | Form 17 | 2/17/2026 | 2/19/2026 | SHUT-IN | 99 | CONTINUOUS | GAS | 0 | NO FLOW | 105 | 115 | No | -- | -- | TEP has initiated a diagnostic evaluation of this well due to the bradenhead threshold pressure exceedance. The bradenhead test was performed through a 1/2" inch valve. |
| Click for Specifics | Full | 3/24/2025 | 4/7/2025 | | 90 | N/A | -- | 0 | No Flow | 98 | 101 | No | No | No | 1/2" blowdown |
| 403746040 | Form 17 | 4/5/2024 | 4/8/2024 | CLOCK/INTERMITTER | 87 | CONTINUOUS | GAS | 0 | WHISPER | 122 | 112 | No | -- | -- | The test was performed through a 1/2" valve. |
| Click for Specifics | Full | 4/1/2024 | 5/13/2024 | | 80 | N/A | -- | 0 | No Flow | 101 | 108 | No | No | No | 1/2 valve |
| Click for Specifics | Full | 2/17/2023 | 3/15/2023 | Shut-In | 72 | N/A | -- | 0 | No Flow | 88 | 90 | No | No | No | 1/2" blowdown |
| Click for Specifics | Full | 2/10/2022 | 3/7/2022 | Clock/Intermitter | 65 | N/A | -- | 0 | No Flow | 97 | 97 | No | No | No | 1/2" blow down |
| Click for Specifics | Full | 6/29/2021 | 7/12/2021 | Clock/Intermitter | 58 | N/A | -- | 0 | No Flow | 123 | 129 | No | No | No | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 0 | | -- | -- | No | No | No | |