| 404308624 | Form 17 | 8/5/2025 | 8/7/2025 | PLUNGER LIFT | 112 | CONTINUOUS | GAS | 0 | NO FLOW | 169 | 166 | No | -- | -- | COA related test. The test was performed through a 2" valve. Well cycled through test. |
| 404289263 | Form 17 | 5/7/2025 | 7/22/2025 | PLUNGER LIFT | 144 | CONTINUOUS | GAS | 0 | NO FLOW | 168 | 170 | No | -- | -- | This test is being resubmitted due to not showing up in well documents or in Bradenhead Test on the scout card. Original document number 404194389 is attached.
This is an annual bradenhead test that was performed on day one of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 1/2 inch valve. |
| 403747365 | Form 17 | 4/8/2024 | 4/9/2024 | PLUNGER LIFT | 173 | CONTINUOUS | GAS | 0 | WHISPER | 165 | 158 | No | -- | -- | The test was performed through a 1/2" valve. |
| Click for Specifics | Full | 3/14/2023 | 4/10/2023 | Plunger Lift | 174 | N/A | -- | 0 | Whisper | 141 | 144 | No | No | No | 1/2" bh. |
| Click for Specifics | Full | 3/17/2022 | 4/18/2022 | Plunger Lift | 174 | N/A | -- | 0 | Whisper | 177 | 167 | No | No | No | blow down 1/2 inch |
| Click for Specifics | Full | 5/11/2021 | 6/7/2021 | Shut-In | 177 | N/A | -- | 0 | No Flow | 160 | 160 | No | No | No | |
| Click for Specifics | Full | 5/4/2021 | 6/7/2021 | Shut-In | 177 | N/A | -- | 0 | Continuous | 151 | 153 | No | No | No | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 240 | | -- | -- | No | No | No | |