| 404145136 | Form 17 | 3/28/2025 | 3/28/2025 | PLUNGER LIFT | 102 | CONTINUOUS | GAS | 0 | WHISPER | 96 | 98 | No | -- | -- | This is an annual bradenhead test that was performed on day four of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 1/2 inch valve. |
| 403714639 | Form 17 | 3/8/2024 | 3/11/2024 | PLUNGER LIFT | 54 | CONTINUOUS | GAS | 0 | WHISPER | 99 | 99 | No | -- | -- | This is an annual bradenhead test using the ECMC approved pilot testing procedure for 2024 which does not involve a seven-day shut-in of the connected bradenhead prior to performing the test. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 1/2" valve. |
| 403336395 | Form 17 | 3/2/2023 | 3/3/2023 | PLUNGER LIFT | 104 | CONTINUOUS | GAS | 3 | CONTINUOUS | 104 | 105 | No | -- | -- | This is an annual bradenhead test that was performed on the sixth day of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 1/2" valve. |
| Click for Specifics | Full | 3/28/2022 | 4/18/2022 | Plunger Lift | 58 | N/A | -- | 54 | N/A | 99 | 108 | No | No | No | Tied in |
| Click for Specifics | Full | 7/6/2021 | 8/9/2021 | Plunger Lift | 139 | N/A | -- | 8 | Continuous | 111 | 111 | No | No | No | |
| 402739406 | Form 17 | 7/6/2021 | 7/7/2021 | PLUNGER LIFT | 139 | CONTINUOUS | GAS | 8 | CONTINUOUS | 111 | 111 | No | -- | -- | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 120 | | -- | -- | No | No | No | |