| 404127940 | Form 17 | 3/13/2025 | 3/14/2025 | PLUNGER LIFT | 123 | CONTINUOUS | GAS | 0 | WHISPER | 156 | 152 | No | -- | -- | This is an annual bradenhead test that was performed after one day of the seven-day shut-in period due to the
bradenhead exceeding the threshold pressure. The bradenhead is connected to the combustor with an approved
pressure management plan. The test was performed through a two-inch valve and the well cycled during the test.. |
| 403651767 | Form 17 | 1/10/2024 | 1/11/2024 | SHUT-IN | 135 | CONTINUOUS | GAS | 1 | CONTINUOUS | 165 | 166 | No | -- | -- | The test was performed through a 1/2" valve. |
| Click for Specifics | Full | 2/20/2023 | 3/15/2023 | Plunger Lift | 132 | N/A | -- | 0 | Whisper | 173 | 174 | No | No | No | 1/2". |
| Click for Specifics | Full | 3/17/2022 | 4/18/2022 | Plunger Lift | 125 | N/A | -- | 0 | No Flow | 183 | 182 | No | No | No | blow down 1/2 inch |
| Click for Specifics | Full | 5/3/2021 | 6/7/2021 | Shut-In | 126 | N/A | -- | 0 | Continuous | 169 | 170 | No | No | No | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 145 | | -- | -- | No | No | No | |