| 404645128 | Form 17 | 5/1/2026 | 5/4/2026 | PLUNGER LIFT | 17 | CONTINUOUS | GAS | 0 | NO FLOW | 84 | 86 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. This well has an approved pressure management plan. The test was performed through a 1/2 inch valve. |
| 404209389 | Form 17 | 5/13/2025 | 5/19/2025 | PLUNGER LIFT | 27 | CONTINUOUS | GAS | 0 | NO FLOW | 70 | 70 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 1/2 inch valve. |
| 403703465 | Form 17 | 2/28/2024 | 2/29/2024 | PLUNGER LIFT | 46 | CONTINUOUS | GAS | 0 | NO FLOW | 67 | 63 | No | -- | -- | This is an annual bradenhead test using the ECMC approved pilot testing procedure for 2024 which does not involve a seven-day shut-in of the connected bradenhead prior to performing the test. The bradenhead is connected to the flowline with an approved pressure management plan. The test was performed through a 1/2" valve. |
| 403309797 | Form 17 | 2/1/2023 | 2/2/2023 | PLUNGER LIFT | 65 | CONTINUOUS | GAS | 0 | NO FLOW | 66 | 68 | No | -- | -- | This is an annual bradenhead test that was performed after the seven-day shut-in period. The bradenhead is connected to the flowline line with an approved pressure management plan. The test was performed through a 1/2" valve. |
| Click for Specifics | Full | 3/23/2022 | 4/18/2022 | Plunger Lift | 60 | N/A | -- | 50 | N/A | 64 | 65 | No | No | No | Tied in |
| Click for Specifics | Full | 7/6/2021 | 8/9/2021 | Flowing | 107 | N/A | -- | 0 | Whisper | 69 | 74 | No | No | No | |
| 402739500 | Form 17 | 7/6/2021 | 7/7/2021 | PLUNGER LIFT | 107 | CONTINUOUS | GAS | 0 | WHISPER | 69 | 74 | No | -- | -- | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 71 | | -- | -- | No | No | No | |