| 404192066 | Form 17 | 5/5/2025 | 5/6/2025 | PLUNGER LIFT | 71 | CONTINUOUS | GAS | 0 | WHISPER | 190 | 190 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the combustor with an approved pressure management plan. The test was performed through a 2 inch valve. |
| Click for Specifics | Full | 2/26/2024 | 3/19/2024 | Plunger Lift | 0 | N/A | -- | 0 | Whisper | 169 | 170 | No | No | No | 1/2" bh tied into combuster |
| Click for Specifics | Full | 1/17/2023 | 2/7/2023 | Plunger Lift | 0 | N/A | -- | 0 | No Flow | 156 | 156 | No | No | No | |
| Click for Specifics | Full | 3/4/2022 | 4/18/2022 | Plunger Lift | 0 | N/A | -- | 0 | N/A | 189 | 189 | No | No | No | blow down 1/2 inch (tied in) |
| Click for Specifics | Full | 7/7/2021 | 8/9/2021 | Plunger Lift | 113 | N/A | -- | 8 | Continuous | 175 | 175 | No | No | No | |
| 402740063 | Form 17 | 7/1/2021 | 7/7/2021 | PLUNGER LIFT | 113 | CONTINUOUS | GAS | 8 | CONTINUOUS | 175 | 175 | No | -- | -- | |
| Click for Specifics | Full | 5/5/2021 | 6/7/2021 | Shut-In | 117 | N/A | -- | 8 | Continuous | 169 | 172 | No | No | No | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 0 | | -- | -- | No | No | No | |