| 404140466 | Form 17 | 3/25/2025 | 3/25/2025 | PLUNGER LIFT | 184 | CONTINUOUS | GAS | 0 | WHISPER | 101 | 99 | No | -- | -- | This is an annual bradenhead test that was performed on day one of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 2 inch valve. Well cycled during test. |
| 403715269 | Form 17 | 3/11/2024 | 3/11/2024 | CLOCK/INTERMITTER | 110 | CONTINUOUS | GAS | 0 | DOWN TO 0 | 104 | 103 | No | -- | -- | This is an annual bradenhead test using the ECMC approved pilot testing procedure for 2024 which does not involve a seven-day shut-in of the connected bradenhead prior to performing the test. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 1/2" valve. |
| 403332330 | Form 17 | 2/27/2023 | 2/28/2023 | PLUNGER LIFT | 204 | CONTINUOUS | GAS | 26 | CONTINUOUS | 177 | 175 | No | -- | -- | This is an annual bradenhead test that was performed on the fourth day of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 1/2" valve. |
| Click for Specifics | Full | 3/29/2022 | 4/18/2022 | Plunger Lift | 112 | N/A | -- | 114 | N/A | 181 | 177 | No | No | No | Tied in |
| Click for Specifics | Full | 7/6/2021 | 8/9/2021 | Plunger Lift | 278 | N/A | -- | 50 | Continuous | 174 | 166 | No | No | No | |
| 402739453 | Form 17 | 7/6/2021 | 7/7/2021 | PLUNGER LIFT | 278 | CONTINUOUS | GAS | 50 | CONTINUOUS | 174 | 166 | No | -- | -- | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 260 | | -- | -- | No | No | No | |