| 404121178 | Form 17 | 3/4/2025 | 3/10/2025 | CLOCK/INTERMITTER | 35 | CONTINUOUS | GAS | 0 | NO FLOW | 42 | 50 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 1/2 inch valve. |
| 403925576 | Form 17 | 9/17/2024 | 9/18/2024 | CLOCK/INTERMITTER | 36 | CONTINUOUS | GAS | 0 | NO FLOW | 67 | 69 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 1/2 inch valve. |
| 403426926 | Form 17 | 6/7/2023 | 6/8/2023 | PLUNGER LIFT | 39 | CONTINUOUS | WATER AND GAS | 0 | NO FLOW | 123 | 120 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 1/2" valve. |
| 403285311 | Form 17 | 1/10/2023 | 1/10/2023 | PLUNGER LIFT | 112 | CONTINUOUS | GAS | 0 | NO FLOW | 118 | 118 | No | -- | -- | |
| Click for Specifics | Full | 3/31/2022 | 9/19/2022 | Plunger Lift | 75 | N/A | -- | 0 | No Flow | 84 | 89 | No | No | No | |
| Click for Specifics | Full | 7/1/2021 | 8/9/2021 | Plunger Lift | 104 | N/A | -- | 0 | No Flow | 129 | 129 | No | No | No | selling |
| 402291335 | Form 17 | 1/23/2020 | 1/29/2020 | PLUNGER LIFT | 85 | WATER H20 | -- | 0 | WATER H20 | 94 | 96 | No | -- | -- | |
| 401984915 | Form 17 | 3/28/2019 | 4/8/2019 | PLUNGER LIFT | 80 | NO FLOW | -- | 0 | NO FLOW | 111 | 108 | No | -- | -- | Well blew dead immediately after opening. |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 45 | | -- | -- | No | No | No | |