| 404301304 | Form 17 | 7/28/2025 | 7/31/2025 | PLUNGER LIFT | 348 | CONTINUOUS | GAS | 0 | WHISPER | 178 | 178 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 1/2 inch valve. |
| 403921722 | Form 17 | 9/12/2024 | 9/16/2024 | PLUNGER LIFT | 437 | CONTINUOUS | GAS | 0 | WHISPER | 70 | 62 | No | -- | -- | This is an annual bradenhead test that was performed on Day Two of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 1/2 inch valve. |
| 403422857 | Form 17 | 6/2/2023 | 6/5/2023 | CLOCK/INTERMITTER | 362 | CONTINUOUS | GAS | 0 | WHISPER | 66 | 61 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 1/2" valve. |
| Click for Specifics | Full | 3/31/2022 | 4/18/2022 | Plunger Lift | 471 | N/A | -- | 0 | Down to Zero | 68 | 68 | No | No | No | |
| 402712625 | Form 17 | 5/18/2021 | 6/9/2021 | PLUNGER LIFT | 518 | CONTINUOUS | GAS | 6 | CONTINUOUS | 55 | 61 | No | -- | -- | **Test data was previously submitted via the bulk upload tool. |
| Click for Specifics | Full | 5/13/2021 | 6/7/2021 | Plunger Lift | 518 | N/A | -- | 6 | Continuous | 55 | 61 | No | No | No | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 209 | | -- | -- | No | No | No | |