| 404377480 | Form 17 | 9/30/2025 | 10/2/2025 | CLOCK/INTERMITTER | 118 | CONTINUOUS | GAS | 0 | WHISPER | 108 | 110 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 1/2 inch valve. |
| 403683488 | Form 17 | 2/6/2024 | 2/12/2024 | CLOCK/INTERMITTER | 94 | CONTINUOUS | GAS | 0 | WHISPER | 110 | 119 | No | -- | -- | This is an annual bradenhead test using the ECMC approved pilot testing procedure for 2024 which does not involve a seven-day shut-in of the connected bradenhead prior to performing the test. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 1/2" valve. |
| 403307733 | Form 17 | 1/31/2023 | 1/31/2023 | FLOWING | 111 | CONTINUOUS | GAS | 0 | NO FLOW | 129 | 132 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 1/2" valve. |
| 403041932 | Form 17 | 5/3/2022 | 5/9/2022 | PLUNGER LIFT | 174 | CONTINUOUS | GAS | 0 | NO FLOW | 137 | 139 | No | -- | -- | This well was previously reported as being scheduled to be connected to the sales line (Doc# 402985992). The bradenhead was not connected in March 2022, as the bradenhead has remained below the threshold pressure until now. TEP is proceeding with connecting the bradenhead to sales line as previously approved and that connection is scheduled to occur this week. |
| 402757234 | Form 17 | 7/21/2021 | 7/22/2021 | PLUNGER LIFT | 164 | CONTINUOUS | WATER AND GAS | 0 | NO FLOW | 155 | 155 | No | -- | -- | |
| Click for Specifics | Full | 6/15/2021 | 7/12/2021 | Plunger Lift | 197 | N/A | -- | 1 | Whisper | 165 | 165 | No | No | No | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 0 | | -- | -- | No | No | No | |