| 404140458 | Form 17 | 3/25/2025 | 3/25/2025 | PLUNGER LIFT | 187 | CONTINUOUS | GAS | 0 | WHISPER | 179 | 161 | No | -- | -- | This is an annual bradenhead test that was performed on day two of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 1/2 inch valve. Well cycled during test. |
| 403715259 | Form 17 | 3/11/2024 | 3/11/2024 | PLUNGER LIFT | 134 | CONTINUOUS | GAS | 0 | WHISPER | 167 | 172 | No | -- | -- | This is an annual bradenhead test using the ECMC approved pilot testing procedure for 2024 which does not involve a seven-day shut-in of the connected bradenhead prior to performing the test. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 1/2" valve. |
| 403337248 | Form 17 | 3/3/2023 | 3/6/2023 | PLUNGER LIFT | 184 | CONTINUOUS | GAS | 0 | WHISPER | 196 | 217 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 1/2" valve. |
| Click for Specifics | Full | 3/31/2022 | 4/18/2022 | Plunger Lift | 146 | N/A | -- | 152 | N/A | 191 | 197 | No | No | No | Tied in |
| Click for Specifics | Full | 7/6/2021 | 8/9/2021 | Plunger Lift | 200 | N/A | -- | 0 | Whisper | 195 | 202 | No | No | No | |
| 402739381 | Form 17 | 7/6/2021 | 7/7/2021 | PLUNGER LIFT | 200 | CONTINUOUS | GAS | 0 | WHISPER | 195 | 202 | No | -- | -- | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 175 | | -- | -- | No | No | No | |