| 403685768 | Form 17 | 2/13/2024 | 2/13/2024 | SHUT-IN | 26 | CONTINUOUS | GAS | 0 | NO FLOW | 0 | 0 | Yes | Yes | No | This Form 17 is being submitted to satisfy the bradenhead testing COA attached to the approved Form 6-NOI (403651605). Bradenhead and production gas samples have been collected and sent to the laboratory. The bradenhead test was performed through a 1/2" valve. |
| Click for Specifics | Full | 1/26/2024 | 2/5/2024 | Injection | 27 | N/A | -- | 0 | No Flow | 0 | 0 | No | No | No | 1/2" Blowdown |
| Click for Specifics | Full | 8/4/2023 | 9/11/2023 | Injection | 26 | N/A | -- | 0 | No Flow | 0 | 0 | No | No | No | 1/2" blowdown |
| Click for Specifics | Full | 3/16/2022 | 4/18/2022 | Injection | 25 | N/A | -- | 0 | No Flow | 0 | 0 | No | No | No | 1/2 valve |
| Click for Specifics | Full | 8/31/2021 | 9/6/2021 | Injection | 24 | N/A | -- | 0 | No Flow | 0 | 0 | No | No | No | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 14 | | -- | -- | No | No | No | |