| 404121182 | Form 17 | 3/4/2025 | 3/10/2025 | CLOCK/INTERMITTER | 138 | CONTINUOUS | GAS | 0 | WHISPER | 262 | 260 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 2 inch valve. Well cycled during test. |
| 403690807 | Form 17 | 2/16/2024 | 2/16/2024 | PLUNGER LIFT | 116 | CONTINUOUS | GAS | 0 | WHISPER | 267 | 265 | No | -- | -- | This is an annual bradenhead test using the ECMC approved pilot testing procedure for 2024 which does not involve a seven-day shut-in of the connected bradenhead prior to performing the test. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 1/2" valve. |
| 403306859 | Form 17 | 1/30/2023 | 1/31/2023 | PLUNGER LIFT | 149 | CONTINUOUS | GAS | 0 | NO FLOW | 242 | 247 | No | -- | -- | This is an annual bradenhead test that was performed on day six of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the sales line line with an approved pressure management plan. The test was performed through a 1/2" valve. |
| Click for Specifics | Full | 2/8/2022 | 3/7/2022 | Plunger Lift | 160 | N/A | -- | 0 | Whisper | 187 | 187 | No | No | No | blow down 1/2 inch |
| Click for Specifics | Full | 10/7/2021 | 10/25/2021 | Plunger Lift | 170 | N/A | -- | 0 | No Flow | 200 | 200 | No | No | No | |
| 402757143 | Form 17 | 7/21/2021 | 7/22/2021 | PLUNGER LIFT | 164 | CONTINUOUS | GAS | 1 | WHISPER | 184 | 184 | No | -- | -- | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 0 | | -- | -- | No | No | No | |