| 404136342 | Form 17 | 3/11/2025 | 3/20/2025 | CLOCK/INTERMITTER | 94 | CONTINUOUS | GAS | 0 | NO FLOW | 179 | 190 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 1/2 inch valve. |
| 403665923 | Form 17 | 1/24/2024 | 1/25/2024 | CLOCK/INTERMITTER | 99 | CONTINUOUS | GAS | 0 | NO FLOW | 216 | 216 | No | -- | -- | This is an annual bradenhead test using the ECMC approved pilot testing procedure for 2024 which does not involve a seven-day shut-in of the connected bradenhead prior to performing the test. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 1/2" valve. |
| 403548584 | Form 17 | 10/3/2023 | 10/3/2023 | CLOCK/INTERMITTER | 99 | CONTINUOUS | GAS | 0 | NO FLOW | 232 | 232 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 1/2" valve. |
| 403185052 | Form 17 | 9/12/2022 | 10/3/2022 | FLOWING | 83 | CONTINUOUS | GAS | 0 | NO FLOW | 209 | 212 | No | -- | -- | Test performed through a 1/2" valve. |
| Click for Specifics | Full | 2/7/2022 | 3/7/2022 | Clock/Intermitter | 74 | N/A | -- | 0 | No Flow | 162 | 166 | No | No | No | 1/2 blowdown |
| Click for Specifics | Full | 7/1/2021 | 8/9/2021 | Clock/Intermitter | 65 | N/A | -- | 0 | No Flow | 115 | 120 | No | No | No | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 0 | | -- | -- | No | No | No | |