| 404053084 | Form 17 | 1/9/2025 | 1/9/2025 | CLOCK/INTERMITTER | 77 | CONTINUOUS | GAS | 0 | WHISPER | 37 | 38 | No | -- | -- | This is an annual bradenhead test that was performed on Day Two of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 1/2 inch valve. |
| 403654557 | Form 17 | 1/15/2024 | 1/15/2024 | CLOCK/INTERMITTER | 27 | CONTINUOUS | GAS | 0 | WHISPER | 36 | 35 | No | -- | -- | This is an annual bradenhead test using the ECMC approved pilot testing procedure for 2024 which does not involve a seven-day shut-in of the connected bradenhead prior to performing the test. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 1/2" valve. |
| 403372511 | Form 17 | 4/7/2023 | 4/13/2023 | CLOCK/INTERMITTER | 80 | CONTINUOUS | GAS | 0 | WHISPER | 37 | 36 | No | -- | -- | This is an annual bradenhead test that was performed on day four of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 1/2" valve. |
| Click for Specifics | Full | 4/6/2022 | 5/16/2022 | Clock/Intermitter | 83 | N/A | -- | 0 | Whisper | 32 | 32 | No | No | No | 1/2 blowdown 7 day buildup |
| Click for Specifics | Full | 9/7/2021 | 10/11/2021 | Clock/Intermitter | 96 | N/A | -- | 0 | Whisper | 31 | 33 | No | No | No | |
| 402698291 | Form 17 | 5/20/2021 | 5/24/2021 | CLOCK/INTERMITTER | 96 | CONTINUOUS | GAS | 0 | WHISPER | 31 | 33 | No | -- | -- | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 109 | | -- | -- | No | No | No | |