| 403557244 | Form 17 | 10/11/2023 | 10/11/2023 | PLUNGER LIFT | 2 | DOWN TO 0 | GAS | 0 | NO FLOW | 163 | 164 | No | -- | -- | This Form 17 is being submitted to satisfy the bradenhead testing COA that was attached to the approved Form 6-NOI (Doc# 403500790). An intermediate casing test was not performed due to the previously reported production casing leak (Doc# 403455357) and safety concerns with performing an intermediate casing test. The bradenhead was not sampled, as the surface casing pressure was 2 psi and below the greater than 25 psi sampling requirement noted in the COA. The test was performed through a 1/2" valve. |
| 403412933 | Form 17 | 5/24/2023 | 5/25/2023 | SHUT-IN | 2 | CONTINUOUS | GAS | 0 | NO FLOW | 166 | 167 | No | -- | -- | This is an annual test. Both the surface and intermediate casing tests were performed through a 1/2" valve. |
| Click for Specifics | Full | 4/8/2022 | 5/16/2022 | Plunger Lift | 8 | N/A | -- | 0 | No Flow | 167 | 167 | No | No | No | 1/2” blowdown |
| Click for Specifics | Full | 5/26/2021 | 6/7/2021 | Plunger Lift | 47 | N/A | -- | 0 | No Flow | 184 | 185 | No | No | No | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 0 | | -- | -- | No | No | No | |