Click for Specifics | Full | 4/26/2024 | 4/30/2024 | | 20 | Down to Zero | -- | 0 | Down to Zero | 944 | 947 | No | No | No | |
Click for Specifics | Full | 4/20/2023 | 5/1/2023 | | 0 | Down to Zero | -- | 0 | Down to Zero | 1546 | 1546 | No | None | None | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will continue to monitor monthly. |
Click for Specifics | Full | 10/17/2022 | 11/8/2022 | Shut-In | 2 | Down to Zero | -- | 0 | Down to Zero | 1487 | 1487 | No | None | None | |
402597195 | Form 17 | 2/1/2021 | 2/10/2021 | FLOWING | 0 | NO FLOW | NONE | 0 | NO FLOW | 1850 | 1850 | No | -- | -- | Test after DOFP. BH dead. |
402565518 | Form 17 | 12/26/2020 | 1/4/2021 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 0 | 0 | No | -- | -- | Test prior to toe-prep/frac. Vacuum on open for 15 seconds. |
402523047 | Form 17 | 10/22/2020 | 10/30/2020 | SHUT-IN | -- | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Test after rig release. Vaccum at open for 1 minute then dead. |