| Click for Specifics | Full | 11/12/2025 | 11/17/2025 | | 3 | Whisper (very low flow) | -- | 0 | No Flow | 468 | 454 | No | No | No | Annual Test. 3 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 4/26/2024 | 4/30/2024 | | 4 | Down to Zero | -- | 0 | Down to Zero | 696 | 693 | No | No | No | |
| 403381486 | Form 17 | 4/21/2023 | 4/24/2023 | FLOWING | 0 | DOWN TO 0 | GAS | 0 | NO FLOW | 1608 | 1608 | No | -- | -- | Post-Production test within 60 days of first sales. 0 PSI, no pressure or flow observed for the entire test. PDC will monitor bradenhead pressure monthly and submit annual test. |
| 403177359 | Form 17 | 9/23/2022 | 9/26/2022 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |