| Click for Specifics | Full | 11/7/2025 | 11/17/2025 | | 0 | No Flow | -- | 0 | No Flow | 411 | 432 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. Operator will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 4/26/2024 | 4/30/2024 | | 9 | Down to Zero | -- | 0 | Down to Zero | 613 | 610 | No | No | No | |
| 403381362 | Form 17 | 4/19/2023 | 4/24/2023 | PLUNGER LIFT | 0 | DOWN TO 0 | GAS | 0 | NO FLOW | 1390 | 1360 | No | -- | -- | Post-Production test within 60 days of first sales. 0 PSI, no pressure or flow observed for the entire test. PDC will monitor bradenhead pressure monthly and submit annual test. |
| 403001462 | Form 17 | 3/28/2022 | 3/31/2022 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 0 | 0 | No | -- | -- | Test prior to toe prep/frac. |