| Click for Specifics | Full | 11/7/2025 | 11/17/2025 | | 0 | No Flow | -- | 0 | No Flow | 320 | 329 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. Operator will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 4/26/2024 | 4/30/2024 | | 0 | Down to Zero | -- | 0 | Down to Zero | 624 | 624 | No | No | No | |
| 403381422 | Form 17 | 4/19/2023 | 4/24/2023 | FLOWING | 15 | DOWN TO 0 | GAS | 0 | NO FLOW | 1562 | 1561 | No | -- | -- | Post-Production within 60 days of first sales. 15 PSI blew down to 0 PSI within first minute of test, no pressure or flow observed for the remainder of the test. PDC will monitor bradenhead pressure monthly and submit annual test. |
| 403003783 | Form 17 | 3/28/2022 | 4/4/2022 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 0 | 0 | No | -- | -- | Test prior to toe prep/frac. |