404182729 | Form 17 | 4/14/2025 | 4/29/2025 | GAS LIFT | 0 | NO FLOW | NONE | 0 | NO FLOW | 561 | 559 | No | -- | -- | Remediation follow up test. 0 PSI, no pressure or flow observed. Operator will monitor pressure and re-test according to bradenhead policy. |
Click for Specifics | Full | 4/26/2024 | 4/30/2024 | | 8 | Down to Zero | -- | 0 | Down to Zero | 927 | 927 | No | No | No | |
403425514 | Form 17 | 6/6/2023 | 6/7/2023 | FLOWING | 89 | CONTINUOUS | GAS AND LIQUID HYDROCARBON | 0 | CONTINUOUS | 2326 | 2322 | Yes | -- | -- | Automation Alert follow-up. 89 PSI gas and ~1 gallon fluid at open, steady stream for 40 seconds, then light trickle until 2 minute mark. Fluid continued to drip for remainder of test. PDC will monitor pressure and re-test according to bradenhead policy. |
403381424 | Form 17 | 4/21/2023 | 4/24/2023 | FLOWING | 16 | DOWN TO 0 | GAS | 0 | NO FLOW | 1748 | 1748 | No | -- | -- | Post-Production within 60 days of first sales. 16 PSI blew down to 0 PSI within first minute of test, no pressure or flow observed for the remainder of the test. PDC will monitor bradenhead pressure monthly and submit annual test. |
403003793 | Form 17 | 3/28/2022 | 4/4/2022 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 0 | 0 | No | -- | -- | Test prior to toe prep/frac. |