| Click for Specifics | Full | 11/7/2025 | 11/17/2025 | | 15 | Continuous | -- | 0 | No Flow | 357 | 357 | No | No | No | Annual Test. 15 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 4/26/2024 | 4/30/2024 | | 18 | Down to Zero | -- | 0 | Down to Zero | 548 | 539 | No | No | No | |
| 403381357 | Form 17 | 4/19/2023 | 4/24/2023 | PLUNGER LIFT | 4 | DOWN TO 0 | GAS | 0 | NO FLOW | 1403 | 1403 | No | -- | -- | Post-Production within 60 days of first sales. 4 PSI blew down to 0 PSI within first minute of test, no pressure or flow observed for the remainder of the test. PDC will monitor bradenhead pressure monthly and submit annual test. |
| 403001426 | Form 17 | 3/28/2022 | 3/31/2022 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 0 | 0 | No | -- | -- | Test prior to toe prep/frac. |