Click for Specifics | Full | 4/26/2024 | 4/30/2024 | | 0 | Down to Zero | -- | 0 | Down to Zero | 474 | 472 | No | No | No | |
403381476 | Form 17 | 4/21/2023 | 4/24/2023 | FLOWING | 2 | DOWN TO 0 | GAS | 0 | NO FLOW | 1466 | 1465 | No | -- | -- | Post-Production within 60 days of first sales. 2 PSI blew down to 0 PSI within first minute of test, no pressure or flow observed for the remainder of the test. PDC will monitor bradenhead pressure monthly and submit annual test. |
403003914 | Form 17 | 3/28/2022 | 4/4/2022 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 0 | 0 | No | -- | -- | Test prior to toe prep/frac. |