404184191 | Form 17 | 4/14/2025 | 4/30/2025 | GAS LIFT | 10 | CONTINUOUS | GAS | 1 | WHISPER | 547 | 540 | No | -- | -- | Remediation follow up test. 10 PSI whisper gas, blew down to 1 within thirty minutes, whisper gas continued for entire test. Operator will monitor pressure and re-test according to bradenhead policy. |
403774797 | Form 17 | 4/26/2024 | 4/30/2024 | | 4 | DOWN TO 0 | GAS | 0 | NO FLOW | 957 | 993 | No | -- | -- | Abatement system follow up test - 4 PSI gas flow blew down to 0 PSI within first minute of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
403381637 | Form 17 | 4/20/2023 | 4/24/2023 | PLUNGER LIFT | 0 | DOWN TO 0 | GAS | 0 | NO FLOW | 2005 | 2005 | No | -- | -- | Post-Production test within 60 days of first sales. 0 PSI, no pressure or flow observed for the entire test. PDC will monitor bradenhead pressure monthly and submit annual test. |
Click for Specifics | Full | 10/17/2022 | 11/8/2022 | Shut-In | 0 | Down to Zero | -- | 0 | Down to Zero | 1425 | 1425 | No | None | None | |
402597202 | Form 17 | 2/1/2021 | 2/10/2021 | FLOWING | 1 | WHISPER | GAS | 0 | NO FLOW | 2203 | 2180 | No | -- | -- | Test after DOFP. Whisper on open for 8 minutes and died. No flow for the remainder of the test. |
402565515 | Form 17 | 12/26/2020 | 1/4/2021 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 0 | 0 | No | -- | -- | Test prior to toe-prep/frac. Vacuum on open for 20 seconds on open. |
402523025 | Form 17 | 10/22/2020 | 10/30/2020 | SHUT-IN | -10 | NO FLOW | -- | 0 | NO FLOW | -- | -- | No | -- | -- | Test after rig release. Vaccum at open for 10 minutes then dead. |