| Click for Specifics | Full | 11/14/2025 | 11/24/2025 | | 0 | No Flow | -- | 0 | No Flow | 335 | 327 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. Operator will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 4/26/2024 | 4/30/2024 | | 0 | Down to Zero | -- | 0 | Down to Zero | 618 | 616 | No | No | No | |
| 403381581 | Form 17 | 4/19/2023 | 4/24/2023 | FLOWING | 16 | DOWN TO 0 | GAS | 0 | NO FLOW | 2073 | 2072 | No | -- | -- | Post-Production within 60 days of first sales. 16 PSI blew down to 0 PSI within first minute of test, no pressure or flow observed for the remainder of the test. PDC will monitor bradenhead pressure monthly and submit annual test. |
| 403177427 | Form 17 | 9/23/2022 | 9/26/2022 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |