| Click for Specifics | Full | 11/7/2025 | 11/17/2025 | | 10 | Continuous | -- | 0 | No Flow | 453 | 453 | No | No | No | Annual Test. 10 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404196777 | Form 17 | 4/22/2025 | 5/8/2025 | GAS LIFT | 5 | CONTINUOUS | GAS | 1 | WHISPER | 659 | 659 | No | -- | -- | Remediation follow up test. 5 PSI continuous gas flow blew down to 1 PSI within thirty minutes. Whisper gas continued for entire test. Operator will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 4/26/2024 | 4/30/2024 | | 8 | Down to Zero | -- | 0 | Down to Zero | 1482 | 1561 | No | No | No | |
| 403326824 | Form 17 | 2/17/2023 | 2/22/2023 | FLOWING | 335 | DOWN TO 0 | MUD | 0 | CONTINUOUS | 1798 | 1810 | Yes | -- | -- | Post-Production within 30 days of first sales. 335 PSI mud on open, collected BH and production samples. Produced ~6 gallons of mud and died. Mud started again at the 10 minute mark and dripped/trickled for remainder of test. Produced ~6.5 gallons total. |
| 403095542 | Form 17 | 7/1/2022 | 7/5/2022 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |