| Click for Specifics | Full | 11/6/2025 | 11/17/2025 | | 0 | No Flow | -- | 0 | No Flow | 747 | 746 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404227553 | Form 17 | 5/20/2025 | 6/3/2025 | FLOWING | 1 | WHISPER | GAS | 1 | WHISPER | 0 | 1 | No | -- | -- | Engineering Ad Hoc test. 1 PSI whisper gas down to 2 PSI in thirty minutes, whisper gas continued for entire test. Operator will continue to monitor monthly. |
| Click for Specifics | Full | 2/14/2025 | 3/4/2025 | | 0 | No Flow | -- | 0 | No Flow | 0 | 0 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403896256 | Form 17 | 8/14/2024 | 8/21/2024 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Delayed Completions Test. 0 PSI, no pressure or flow observed for the entire test. |
| 403675324 | Form 17 | 2/1/2024 | 2/2/2024 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Delayed Completions Test. 0 PSI, no pressure or flow observed for the entire test. |
| 403495731 | Form 17 | 8/4/2023 | 8/14/2023 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |