| Click for Specifics | Full | 11/10/2025 | 11/17/2025 | | 0 | No Flow | -- | 0 | No Flow | 430 | 430 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. Operator will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 10/15/2024 | 10/22/2024 | | 0 | No Flow | -- | 0 | No Flow | 633 | 632 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 11/6/2023 | 11/13/2023 | Plunger Lift | 0 | Down to Zero | -- | 0 | Down to Zero | 475 | 474 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 12/2/2022 | 12/12/2022 | | 0 | Down to Zero | -- | 0 | Down to Zero | 540 | 540 | No | No | No | |
| Click for Specifics | Light | 9/1/2021 | 9/6/2021 | Plunger Lift | 0 | | -- | 0 | | 396 | 396 | No | No | No | Test per NTO. BH dead. |
| Click for Specifics | Light | 11/24/2020 | 12/7/2020 | Flowing | 0 | | -- | 0 | No Flow | 408 | 408 | No | No | No | Test per NTO. Vaccum at open for 10 seconds then dead. |
| 402207312 | Form 17 | 10/8/2019 | 10/11/2019 | FLOWING | 0 | NO FLOW | -- | 0 | NO FLOW | 1358 | 1358 | No | -- | -- | Test after DOFP. Slight vacuum. BH dead |
| 402131114 | Form 17 | 7/28/2019 | 8/1/2019 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Test prior to toe-prep. |