Click for Specifics | Full | 7/1/2024 | 7/9/2024 | | 0 | No Flow | -- | 0 | No Flow | 285 | 285 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
403627868 | Form 17 | 12/15/2023 | 12/18/2023 | FLOWING | 78 | CONTINUOUS | GAS AND LIQUID HYDROCARBON | 0 | CONTINUOUS | 1593 | 1587 | No | -- | -- | Post-Production within 60 days of first sales. 78 PSI gas and ~1 gallon fluid down to 0 PSI within first minute of test, fluid trickled for the remainder of the test, ~2 gallons total. PDC will monitor bradenhead pressure monthly and submit annual test. |
403417896 | Form 17 | 5/30/2023 | 5/31/2023 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |