| Click for Specifics | Full | 11/20/2025 | 11/24/2025 | | 0 | No Flow | -- | 0 | No Flow | 404 | 402 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404359446 | Form 17 | 9/9/2025 | 9/18/2025 | GAS LIFT | 2 | CONTINUOUS | GAS | 0 | NO FLOW | 473 | 440 | No | -- | -- | Remediation follow up test. 2 PSI whisper blew down to 0 PSI within five minutes of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404127433 | Form 17 | 3/3/2025 | 3/13/2025 | INJECTION | 99 | CONTINUOUS | GAS AND LIQUID HYDROCARBON | 1 | WHISPER | 597 | 600 | No | -- | -- | Engineering Ad Hoc test. 99 PSI gas and liquid hydrocarbon blew down to 1 PSI in thirty minutes. Gas and liquid hydrocarbon observed for entire test, ~2 gal liquid. Operator will schedule a sampling event and submit results via form 43. Operator will continue to monitor monthly. |
| Click for Specifics | Light | 11/25/2024 | 12/10/2024 | | 41 | | -- | 0 | | 568 | 562 | No | No | No | |
| 403627951 | Form 17 | 12/15/2023 | 12/18/2023 | FLOWING | 0 | DOWN TO 0 | GAS | 0 | NO FLOW | 1662 | 1645 | No | -- | -- | Post-Production test within 60 days of first sales. 0 PSI, no pressure or flow observed for the entire test. PDC will monitor bradenhead pressure monthly and submit annual test. |
| 403418719 | Form 17 | 5/30/2023 | 5/31/2023 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |