Click for Specifics | Light | 11/25/2024 | 12/10/2024 | | 0 | | -- | 0 | | 689 | 689 | No | No | No | |
403627993 | Form 17 | 12/15/2023 | 12/18/2023 | FLOWING | 0 | DOWN TO 0 | GAS | 0 | NO FLOW | 1582 | 1563 | No | -- | -- | Post-Production test within 60 days of first sales. 0 PSI, no pressure or flow observed for the entire test. PDC will monitor bradenhead pressure monthly and submit annual test. |
403418733 | Form 17 | 5/30/2023 | 5/31/2023 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |