Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-001-10334Brant Federal
21C
PDC ENERGY INC
69175
PR
10/1/2023
WATTENBERG
90750
ADAMS  001
SENE 11 1S67W 6
460107
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 2038 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404220226Form 175/20/20255/28/2025GAS LIFT1WHISPER GAS1 WHISPER 840849No----Annual test. 1 PSI whisper gas blew down to 1 PSI in thirty minutes, whisper gas observed throughout entire test. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy.
403829282Form 176/13/20246/18/2024 0NO FLOW NONE0 NO FLOW 14871487No----Remediation follow up test. 0 PSI, no pressure or flow observed. PDC will monitor pressure and re-test according to bradenhead policy.
403636615Form 1712/20/202312/27/2023FLOWING75DOWN TO 0 WATER H200 CONTINUOUS 16981699No----High pressure follow-up test. 75 PSI and 2 cup fluid on open. Fluid trickle/dripped for entire test, ~2.5 cups total. PDC will schedule a sampling event and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy.
403628016Form 1712/15/202312/18/2023FLOWING0CONTINUOUS WATER H200 NO FLOW 17801769No----Post-Production test within 60 days of first sales. 0 PSI, ~1 cup fluid on open. Light trickle for 2.5 minutes, then steady drip until 17 minute mark, ~1 pint total. No flow or pressure for remainder of test. PDC will monitor bradenhead pressure monthly and submit annual test.
403418737Form 175/30/20235/31/2023SHUT-IN0NO FLOW --0 NO FLOW 00No----Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy.